Insights

Blog

Updates from the SAP world, regulatory changes, and field experience from our team.

The 2026 e-transformation calendar: who moves to e-Invoice, e-Archive and e-Ledger, and when

The e-Archive amount limit ended on 1 January and the TRY 3 million threshold lands on 1 July. We turned the communiqués into an SAP-side checklist.

E-Dönüşüm · September 14, 2026

e-Invoice integration in SAP: how to build an integrator-independent architecture

If changing your integrator changes your process, the architecture is wrong. How we separate document, conversion, transmission and response layers inside SAP.

E-Dönüşüm · September 10, 2026

e-Reconciliation and BA/BS: the short route to fewer period-end surprises

If account reconciliation runs on e-mails and BA/BS forms on spreadsheets, the close stalls in the same place every month. How we build the process in SAP.

E-Dönüşüm · September 6, 2026

Talking to your SAP data: where AI helps in reporting — and where it doesn't

AI delivers real gains in SAP reporting — but not in every scenario. We separate the cases where it works from the ones where it does not.

Confiq AI · June 25, 2026

Why does month-end close take so long? Six bottlenecks Use Cases

When the close stretches to six days, the problem is usually the process, not the team. Here are the six bottlenecks we meet most often — and the practical fix for each.

SAP Destek · June 23, 2026

As 2027 approaches: five decisions to make on your S/4HANA move

ECC maintenance ends in a few years. Here are the five decisions that need to be settled before you build a migration timeline — with examples from the field.

S/4HANA · June 20, 2026

RISE with SAP, GROW and on-premise: do not mistake the contract for the method

None of the three fits in the word ‘cloud’. RISE is how you operate, GROW is a standard-first product, on-premise is control. Greenfield is a separate call.

S/4HANA · June 18, 2026 · 8 min read

Türkiye e-invoicing on SAP, GİB, and a localization brief

e-Invoicing is not phase 2 of go-live. GİB calendars, parked invoices and internal approval are different clocks. Localization is not a language pack.

Genel · May 8, 2026 · 9 min read

What SAP AMS is — and why a ‘support contract’ is not enough

AMS is not a ticket queue. It is carrying live SAP with the close and the gazette. An SLA alone does not write culture.

SAP Destek · April 2, 2026 · 7 min read

Greenfield, brownfield, bluefield: which S/4HANA call is the real one?

Three words sit together on a slide. In production they do not. The call is data and close discipline, not a slogan.

S/4HANA · March 12, 2026 · 8 min read